Where Efficiency Meets Reliability.
Concrete driveway aprons that meet standard details at commercial approaches and public access points.
The apron between the roadway and a driveway takes constant turning and loading stress, and we build it to the city standard approach detail. Our crews match the required width, thickness, and flare geometry so the approach passes inspection and permits close out. Grades are set to keep water in the gutter line rather than sheeting into the roadway or the property. Reinforcement and jointing are detailed for the truck traffic these approaches often carry.
Built to municipal standard approach details; geometry that passes right-of-way inspection; grades that keep runoff in the gutter line; reinforced for commercial and truck loading; permit-ready documentation on completion
1) Verify the approach permit and applicable standard detail; 2) Saw-cut and remove the existing apron section; 3) Form to width, flare, and thickness with jointing; 4) Pour, finish, and restore the gutter and sidewalk transitions
Apron width, thickness, and flare geometry; existing pavement and curb removal; loading requirements for truck traffic; utility conflicts within the approach; right-of-way permitting and inspection
Aprons are best poured in dry weather so the gutter-line grades set true and curing is not disturbed by runoff.